5
Years Plan - III (1979/80 -1983/84): The development of the production
fields and the refineries.
|
|
|
|
Following the discovery by PERTAMINA-Agip Spa in 1973, in 1983 PERTAMINA -Esso succeeded to prove that the gas reserve in block D Alpha of the Natuna Sea was very huge (210 TCF). The high CO2 content became a challenge in developing the Natuna gas field. |
|
In 1984,the fifth train of the Arun plant was in operation, making its capacity to reach 1,7 billion standard cubic feet of gas per day. The construction of this train was a link for the utilization of LNG as a source to obtain foreign exchange. |
In 1981 measures were taken to increase the production of fossil fuel to fulfill the domestic need.
|